Tilt Panels are Flying!

We are in full swing flying tilt panels and setting them into place. These concrete tilt panels will form the building’s exterior wall. The majority of the slab-in has been completed with the pour backs at the panels and the electrical room expected to be completed next. Throughout the site, the sewer and water are complete around what will be 247th Ave and the new pioneer road.

In the next few weeks, we the steel to be on-site and installed and expect this process to take roughly a month. We are looking forward to our next milestone which will be completing the dry in and seeing the sky bridge in its final form, which will be wrapped in polycarbonate in opal coloring.